Skip to main content
This inventory is the decision table for Cloudflare backend ownership. It reflects checked-in source on 2026-10-25. A source definition is not proof that a hosted schedule runs or succeeds; confirm hosted state before a cutover.

Summary

Scheduled Vercel opportunities total 2,887 per day in this repository. Moving only the schedule does not reduce processor invocations; processor moves do.

Overlap safety classes

Cutover safety depends on whether two owners can run the same slot without duplicating a side effect. Cron Control’s slot claim deduplicates its own ticks, not a concurrent Vercel tick.

Vercel Cron jobs

Declaration locations for these 13 current Vercel schedules: Per-job Vercel declaration lines and current cadences: The Web cron catalog lists deadline reminders every four hours, but the deployed Vercel entry runs every five minutes. Preserve the live cadence; do not run sync-web-crons, which would also drop report automation from the schedule.

pg_cron jobs

Live jobs after replaying every migration’s schedule and unschedule calls. process-notification-batches was unscheduled by a later migration. Schedule declaration locations for the live jobs: process-notification-batches is excluded from the live count because apps/database/supabase/migrations/20251111101347_update_notification_batch_processor_to_call_api.sql:13 unschedules it. The migration replay, rather than the initial schedule alone, defines the current PostgreSQL owner set. Retained exceptions. Each retained job runs a single statement against Postgres tables with no HTTP, storage or provider side effect. A Cloudflare trigger would add a Worker invocation and a service-key HTTP round trip per tick to execute the same SQL in the same database: more cost and credential exposure, no compute moved off Supabase. Owners should still review the three every-minute jobs’ cadence. Any job that gains an outbound call loses its exception.

Next.js after() continuations

These run after the response on the hosting function, with no durable owner. A crashed or recycled function silently loses them. The nine active after() call sites are request/webhook continuations, not durable schedules:

Processors without a hosted schedule

These routes exist but no Vercel entry, pg_cron job or Worker trigger calls them. They may have relied on the retired Docker runner; confirm the intended owner before scheduling any of them. These eight processor routes have no current hosted schedule: Workspace managed cron jobs (workspace_cron_jobs) have a due-job claim RPC but no live scheduler since the Docker runner retired; only run-now routes execute them. A Cron Control job draining that claim RPC is the target, gated on a product decision because enabling it starts user-defined outbound requests.

Existing Cloudflare owner

apps/cron-control runs every five minutes, requeues stale push batches and calls the Web immediate-delivery processor only when a pending immediate batch exists. See Cloudflare Cron Control.

Phase 1: pay-products scheduler qualification

pay-products is the first scheduler move because it runs twice per day and the existing processor converges product rows with provider-ID upserts. Cron Control already declares the same 0 */12 * * * schedule and the authenticated Pay processor route. The dispatch regression now pins its per-slot request bound, single transient retry, duplicate-slot behavior, and durable stop after five failed slots across ledger reconstruction. This phase qualifies source behavior only. CRON_CONTROL_ENABLED_JOBS remains empty in apps/cron-control/cloudflare.config.ts, and the Vercel declaration remains active in apps/pay/vercel.json. Do not change either until an authorized production rollout has installed the Pay origin and matching cron secret, shown one successful Cloudflare slot, and recorded the Vercel last-run boundary. The old Vercel schedule stays the owner until then. Roll back a later cutover by stopping/removing pay-products from Cron Control and restoring its Vercel entry. The five scheduled GitHub workflows are operational automation rather than product background work: .github/workflows/mobile-testflight-review-queue.yaml drains a release-review queue; release-please-auto-merge.yaml handles release branches; actions-storage-report.yaml reports CI artifact storage; security-checks.yaml runs security scans; and security-review-sweep.yaml handles security-review automation. They remain on GitHub Actions and are not part of the product scheduler migration. Exact GitHub schedule declarations:

Schedule catalogs and empty owners

apps/web/cron.config.json:6-60 and apps/infrastructure/cron.config.json:6-36 are source catalogs consumed by schedule generation and monitoring. They are not all current triggers: the Web deadline-reminder catalog says every four hours while Vercel runs every five minutes; Calendar gateway entries have vercel: false; the immediate-notification path is already on Cron Control; and the Hive catalog route is disabled. No supabase/functions/ tree, Trigger.dev config/SDK/import, or active packages/workflows task runner exists in this checkout. apps/cron-control/cloudflare.config.ts:21-31 declares nine Cron Trigger expressions. The checked-in active Cloudflare owner is immediate-notification recovery; the 14 legacy jobs in apps/cron-control/src/jobs.ts:63-167 remain default-off in cloudflare.config.ts:40. A catalog entry is not evidence that a hosted trigger is enabled or healthy.

Migration waves

  1. Scheduler cutover. Qualify and then move pay-products first, preserving its 12-hour cadence, default-off behavior, auth contract and per-slot operation envelope. Next move tasks-cleanup-media, infrastructure-sync-trust-cache, calendar-provider-sync, and the finance-exchange-rates pg_net call. Then move the claim-fenced jobs web-notification-batches, web-post-email-queue, web-topic-announcements, web-report-automation, and inventory-checkout-expiry. Move calendar-smart-schedule and web-deadline-reminders only after removing their old owner and confirming its last run. Keep the seven pure-SQL jobs in Postgres under the existing exception.
  2. Worker processors. Keep checkout expiry as the tested template, then move cleanup media with a durable cursor, product sync with bounded pagination/upserts, and trust-cache writes with their 32-write concurrency cap. Keep the pay-products Worker processor default-off until the Worker path has exact-artifact and runtime acceptance.
  3. Queues and workflows. Move notification, email, announcement and report delivery, calendar provider sync, then the after() sites, with retry budgets aligned to their existing claims and persisted progress.
  4. Retirements. Confirm with Infrastructure owners whether to retire infrastructure-docker-recovery-alerts and infrastructure-sample-resources; retire the disabled Hive simulation route only after its owner confirms there is no remaining need.
Per-job cutover steps live in the Cron Control runbook; processor targets and cost bounds live in processor migration.